Data Center Market Intel

Researched, sourced, and derived by Azraq — rates, cost, and risk data, by market, rebuilt as one linked set so every figure can be checked against every other. Search below, or scan by category.

Boston rate $205–340 /kW/mo · Enterprise–AI Training US vacancy 1.4% national avg, FY2025 Cap rate ~5.0–6.5% powered shell–turnkey Industry PUE 1.52 global avg · target <1.4 by 2030 2026 moratoria 294 first 7 months, up from 6 in 2024

No benchmarks match that search.